The project is one of the fruits of smart partnerships between service companies in Sudan, where the owner was consulted in the design of a building for the management of the Arab Computer Company, consisting of a basement, ground + mezzanine and seven floors, and then several design options were made and the owner chose one of them, and estimates and costs were made for the project It was approved and the contract was signed to implement a first phase of work, which includes the basement, ground floor + mezzanine and four floors.
The problems of water leakage in the soil are considered one of the biggest problems facing the construction and implementation works of buildings. After consulting with the structural designer, an insulating work was reached in Tomini for the entire building, as well as the high heights of some elements of the project.